![background image](http://html1.mh-extra.com/html/daikin/fhq100buv3b/fhq100buv3b_service-manual_2459262323.webp)
ESIE05-04
Disassembly and Maintenance
Part 5 – Disassembly and Maintenance
5–73
3
5
1
5
2
Installing the PC board and
re-wiring inside the switch
box
1
Engage the PC board
with two claws shown in
the right figure, push up
the board until a click
sound is generated, then
connect the lead wires
shown right.
2
Next connect the lead
wires in the route shown
below and fix them with
tie wrap in the following
order.
c
Connect the fan
motor lead wire to the
connector X20A.
d
Connect the lead wire
of capacitor for fan
motor to the
capacitor.
e
Insert the lead wire of
drain pump to the
connector X25A.
f
Connect the lead wire
of float switch to
X15A through the
specified path and
wire clamp 1.
g
Insert two thermistors
to the connector
matching the color
with X17A and X18A
through the wire
clamp 1
(e.g. connect the wire
with yellow tape to the
yellow connector).
Connect the lead wire of
float switch and two
pieces of wire of
thermistor to the switch
box by using tie wrap
h
.
(Use tie wrap properly to
prevent the wire from
contact with hot part of
the PC board.)
Insert the rubber bushing
of air temperature
thermistor
i
into the slit
of switch box.
Then, check that it is
connected to the
connector X19A.
Step
Procedure
Points
P1 P2F1 F2
X10A
X36A
X5A
X11A
X27A
Hooking claws for mounting PC board (Three locations)
Fixing claws for the PC board with pushing force upward
(Two locations)
(S2689)
Lead wire of swing motor
:X36A
High roltage cable of transformer :X11A
Low roltage cable of transformer
:X10A
Outdoor unit connection wire
:X27A
Wire of remote controller
:X5A
(S2690)
∗
Be careful that the lead wire does not lay off the groove.
To drain pump
To
float switch
e
Drain pump connector
h
Tie wrap
g
Heat exchanger
thermistor connectors
X17A, X18A
d
Lead wire of
capacitor for
fan motor
i
Rubber bushing for
air temp. thermistor
f
Connector X15A
for float switch
j
Tie wrap for low-tension
cable of transformer
c
Fan motor lead wire X20A
To heat
exchanger
thermistor
Wire clamp
���
Slack wire here
if the wire is
excessively long.
Summary of Contents for FHQ100BUV3B
Page 1: ...Service Manual ESIE05 04 R 410A Sky Air Indoor...
Page 2: ......
Page 20: ...ESIE05 04 1 2 Part 1 System Outline 3 1 1 5...
Page 62: ...General Outline ESIE05 04 1 44 Part 1 System Outline 3 1 1 4 5...
Page 78: ...ESIE05 04 1 60 Part 1 System Outline...
Page 112: ...Wiring Diagrams ESIE05 04 1 94 Part 1 System Outline 3 1 1 4 5...
Page 140: ...ESIE05 04 2 2 Part 2 Functional Description 3 1 2 5...
Page 164: ...ESIE05 04 3 2 Part 3 Troubleshooting 3 1 3 5...
Page 206: ...Error Codes ESIE05 04 3 44 Part 3 Troubleshooting 3 1 3 4 5...
Page 224: ...Additional Checks for Troubleshooting ESIE05 04 3 62 Part 3 Troubleshooting 3 1 3 4 5...
Page 226: ...ESIE05 04 4 2 Part 4 Commissioning and Test Run 3 1 4 5...
Page 252: ...ESIE05 04 5 2 Part 5 Disassembly and Maintenance 3 1 5...
Page 384: ...Disassembly and Maintenance ESIE05 04 5 134 Part 5 Disassembly and Maintenance 3 1 5 5...
Page 390: ...ESIE05 04 vi Index 3 1 4 5 W Wiring diagrams Indoor units k 1 61...