![background image](http://html1.mh-extra.com/html/daikin/fhq100buv3b/fhq100buv3b_service-manual_2459262341.webp)
ESIE05-04
Disassembly and Maintenance
Part 5 – Disassembly and Maintenance
5–91
3
5
1
5
1.13.6 Removal of Bottom Panel and Drain Pan
Warning
Be sure to wait 10 minutes or more after turning off all power supplies before disassembling work.
Procedure:
Step
Procedure
Points
1
Remove the 7 bottom
panel installation screws
(2 each on the left and
right, 3 in the rear), and
remove the bottom
panel.
Remove the rear surface screws
(2 each on the left and right), and
remove the center screw while
supporting the bottom panel from
underneath.
2
Let down the rear of the
bottom panel, push out
toward the front
(removed from the
hooking part) and
remove.
Summary of Contents for FHQ100BUV3B
Page 1: ...Service Manual ESIE05 04 R 410A Sky Air Indoor...
Page 2: ......
Page 20: ...ESIE05 04 1 2 Part 1 System Outline 3 1 1 5...
Page 62: ...General Outline ESIE05 04 1 44 Part 1 System Outline 3 1 1 4 5...
Page 78: ...ESIE05 04 1 60 Part 1 System Outline...
Page 112: ...Wiring Diagrams ESIE05 04 1 94 Part 1 System Outline 3 1 1 4 5...
Page 140: ...ESIE05 04 2 2 Part 2 Functional Description 3 1 2 5...
Page 164: ...ESIE05 04 3 2 Part 3 Troubleshooting 3 1 3 5...
Page 206: ...Error Codes ESIE05 04 3 44 Part 3 Troubleshooting 3 1 3 4 5...
Page 224: ...Additional Checks for Troubleshooting ESIE05 04 3 62 Part 3 Troubleshooting 3 1 3 4 5...
Page 226: ...ESIE05 04 4 2 Part 4 Commissioning and Test Run 3 1 4 5...
Page 252: ...ESIE05 04 5 2 Part 5 Disassembly and Maintenance 3 1 5...
Page 384: ...Disassembly and Maintenance ESIE05 04 5 134 Part 5 Disassembly and Maintenance 3 1 5 5...
Page 390: ...ESIE05 04 vi Index 3 1 4 5 W Wiring diagrams Indoor units k 1 61...