
Disassembly and Maintenance
ESIE05-04
5–28
Part 5 – Disassembly and Maintenance
3
1
5
5
1.11.4 Removal of Horizontal Blade
Warning
Be sure to wait 10 minutes or more after turning off all power supplies before disassembling work.
Procedure:
Step
Procedure
Points
1
Remove 4 screws each
(16 screws in total) to
dismount the 4 seal
materials.
2
Remove 2 screws each
(16 screws in total) to
dismount the 8
horizontal blade
bearings.
Reassembling
Q
Make sure that the air outlet
insulation material (seal
material) is as shown below
(may result in dew
condensation).
Seal material
Horizontal
blade
bearing
Swing motor
Horizontal blade
Air outlet insulation material
Seal
material
No catching or gap is allowed for
the seal material
Summary of Contents for FHQ100BUV3B
Page 1: ...Service Manual ESIE05 04 R 410A Sky Air Indoor...
Page 2: ......
Page 20: ...ESIE05 04 1 2 Part 1 System Outline 3 1 1 5...
Page 62: ...General Outline ESIE05 04 1 44 Part 1 System Outline 3 1 1 4 5...
Page 78: ...ESIE05 04 1 60 Part 1 System Outline...
Page 112: ...Wiring Diagrams ESIE05 04 1 94 Part 1 System Outline 3 1 1 4 5...
Page 140: ...ESIE05 04 2 2 Part 2 Functional Description 3 1 2 5...
Page 164: ...ESIE05 04 3 2 Part 3 Troubleshooting 3 1 3 5...
Page 206: ...Error Codes ESIE05 04 3 44 Part 3 Troubleshooting 3 1 3 4 5...
Page 224: ...Additional Checks for Troubleshooting ESIE05 04 3 62 Part 3 Troubleshooting 3 1 3 4 5...
Page 226: ...ESIE05 04 4 2 Part 4 Commissioning and Test Run 3 1 4 5...
Page 252: ...ESIE05 04 5 2 Part 5 Disassembly and Maintenance 3 1 5...
Page 384: ...Disassembly and Maintenance ESIE05 04 5 134 Part 5 Disassembly and Maintenance 3 1 5 5...
Page 390: ...ESIE05 04 vi Index 3 1 4 5 W Wiring diagrams Indoor units k 1 61...