![background image](http://html1.mh-extra.com/html/daikin/fhq100buv3b/fhq100buv3b_service-manual_2459262313.webp)
ESIE05-04
Disassembly and Maintenance
Part 5 – Disassembly and Maintenance
5–63
3
5
1
5
4
Insert the float switch
ass'y.
At this time, put the lead
wires in the wiring groove
properly.
5
Install the drain pump
together with the float
switch with screw
d
and
e
.
Step
Procedure
Points
(S2661)
Wiring groove
Lead wires
Screw
Screw
(S2669)
When install the drain
pan, put the lead wires
of float switch and drain
pump in wiring groove
and pass the lead wires
above on the black
sealing material on the
drain pan.
(Otherwise, due
dripping may occur due
to leakage of cool air.)
Summary of Contents for FHQ100BUV3B
Page 1: ...Service Manual ESIE05 04 R 410A Sky Air Indoor...
Page 2: ......
Page 20: ...ESIE05 04 1 2 Part 1 System Outline 3 1 1 5...
Page 62: ...General Outline ESIE05 04 1 44 Part 1 System Outline 3 1 1 4 5...
Page 78: ...ESIE05 04 1 60 Part 1 System Outline...
Page 112: ...Wiring Diagrams ESIE05 04 1 94 Part 1 System Outline 3 1 1 4 5...
Page 140: ...ESIE05 04 2 2 Part 2 Functional Description 3 1 2 5...
Page 164: ...ESIE05 04 3 2 Part 3 Troubleshooting 3 1 3 5...
Page 206: ...Error Codes ESIE05 04 3 44 Part 3 Troubleshooting 3 1 3 4 5...
Page 224: ...Additional Checks for Troubleshooting ESIE05 04 3 62 Part 3 Troubleshooting 3 1 3 4 5...
Page 226: ...ESIE05 04 4 2 Part 4 Commissioning and Test Run 3 1 4 5...
Page 252: ...ESIE05 04 5 2 Part 5 Disassembly and Maintenance 3 1 5...
Page 384: ...Disassembly and Maintenance ESIE05 04 5 134 Part 5 Disassembly and Maintenance 3 1 5 5...
Page 390: ...ESIE05 04 vi Index 3 1 4 5 W Wiring diagrams Indoor units k 1 61...