Operating Test
Si18-201
208
Operating Test
1. Record the installation location of each BP unit in the centralized name plate attached to the front panel (2) of the indoor unit.
↓
2. Open the liquid/gas closing valves.
↓
3. Check for improper wiring and piping.
With a remote controller, start the cooling operation in one single room only.
(Operating condition: indoor/outdoor temperature of –5˚C or higher)
Set the temperature to 18˚C.
After operating for 5 minutes, check that the temperature difference between inlet and outlet of the indoor unit is 8˚C or higher.
Likewise, perform the above step with all indoor units.
If some improper wiring or piping is found, correct them, and then check again.
* Before the operation check is completed on one unit, start the operation of the next indoor unit to be checked so that some
trial operation time can be saved. (If the trial operation is performed on every indoor unit one by one, since the compressor
is stopped after each operation, it will take some time to restart for the next operation.)
↓
4. After checking for improper piping and wiring, record the installation locations of indoor units
the wiring name plate attached to the BP main body.
↓
5. After checking that all the piping and wiring is done properly, start the trial operation in heating mode.
With a remote controller, perform the heating operation for all rooms. (Set the temperature to 32˚C.)
After operating for 60 minutes, check that the temperature difference between inlet and outlet is 15˚C or higher.
↓
6. Upon completion of the trial operation, stop the operation for all rooms with the remote controller.
Note: 1. When performing a trial operation, check that the indoor/outdoor temperatures satisfy the following conditions:
Cooling: –5˚C or higher
Heating: 25˚C or lower
2. For the pump down procedure, refer to the trouble diagnostic name plate attached to the front panel (2).
connected to the BP unit in
1P058917A
1P058918A
INITIALIZE SETTING
Check the number of indoor units
connected to the BP unit before
test operation. Press INITIALIZE SW[SW6] to make the setting.
( "888"
: Blinking
→
Number of connected units appears
→
Setting
)
<
CAUTION
>
T h e s e t t i n g m u s t b e m a d e i n o r d e r t o o p e r a t e t h e u n i t . C a n n o t b e
o p e r a t e d u n l e s s B P 1 i s c o n n e c t e d f i r s t . ( C o n n e c t B P u n i t i n o r d e r
s t a r t i n g f r o m B P 1 )
<
CAUTION
>
1 ) T r a n s m i s s i o n e r r o r d i s p l a y
2 ) S e t i n s p i t e o f t r a n s m i s s i o n e r r o r ( C a n c e l s e t t i n g )
1 R e s e t t h e p o w e r s u p p l y .
2 A p p r o x i m a t e l y 1 m i n u t e a f t e r t h e " 8 8 8 " i s d i s p l a y e d o n t h e
L E D S 2 - 4 , n u m b e r o f i n d o o r u n i t s c o n n e c t e d t o e a c h B P
u n i t w i l l b e d i s p l a y e d i n s t e a d . ( L i g h t i n g t i m e : A p p r o x . 3 0 s e c )
3 T h e n p r e s s t h e S E T S W [ S W 6 ] .
[ S E T T I N G O P E R A T I O N ]
A f t e r p o w e r i s t u r n e d O N , " 8 8 8 " b l i n k s i n t h e d i g i t a l d i s p l a y .
A f t e r 1 m i n u t e , t h e d i g i t a l d i s p l a y w i l l s h o w t h e f o l l o w i n g
i n f o r m a t i o n .
I f t h e u n i t c o r r e c t l y d i s p l a y s t h e n u m b e r o f c o n n e c t e d r o o m s ,
p r e s s S W 6 t o m a k e t h e s e t t i n g .
: B P u n c o n n e c t e d , o r t r a n s m i s s i o n f a i l u r e b e t w e e n
o u t d o o r u n i t a n d B P u n i t .
C o n n e c t i n d o o r u n i t s ( 1 r o o m s ) t o B P 3
C o n n e c t i n d o o r u n i t s ( 3 r o o m s ) t o B P 2
C o n n e c t i n d o o r u n i t s ( 2 r o o m s ) t o B P 1
Summary of Contents for BPMK928B42
Page 9: ...Si18 201 viii Table of Contents ...
Page 71: ...Specifications Si18 201 58 Specifications ...
Page 206: ...Si18 201 Remote Controller Operations 193 1 1 2 FVX25 35KZ ...
Page 207: ...Remote Controller Si18 201 194 Operations 1 1 3 FTXD25 35KZ ...
Page 208: ...Si18 201 Remote Controller Operations 195 1 1 4 FTK FTX50 60H ...
Page 209: ...Remote Controller Si18 201 196 Operations 1 1 5 FTKD FTXD50 60 71J ...
Page 214: ...Si18 201 Remote Controller Operations 201 ...
Page 216: ...Si18 201 Remote Controller Operations 203 ...
Page 217: ...Remote Controller Si18 201 204 Operations ...
Page 237: ...Method of Field Set Si18 201 224 Operating Test ...
Page 262: ...Si18 201 Troubleshooting SkyAir Indoor Unit Service Diagnosis 249 ...
Page 393: ...Wiring Diagrams Si18 201 380 Appendix FHYC35 50 60 71KVE9 3D005668C ...
Page 394: ...Si18 201 Wiring Diagrams Appendix 381 FHYC35 50 60 71KV1C9 ...
Page 395: ...Wiring Diagrams Si18 201 382 Appendix FDYM60 03FAV1 FDYM60 03FAVAL C 3D019816D OPTION ...
Page 396: ...Si18 201 Wiring Diagrams Appendix 383 FDYM60 03FAV1C ...