![background image](http://html.mh-extra.com/html/daikin/2mks40g2v1b/2mks40g2v1b_service-manual_501075285.webp)
SiBE12-816_D
Outdoor Unit
Removal Procedure
274
4
Remove the 4 screws
and remove the
discharge grille.
When reassembling, make
sure to fit the 4 hooks.
5
Remove the 2 screws
and remove the stop
valve cover.
When reassembling, make
sure to fit the 4 hooks.
Step
Procedure
Points
(R12767)
(R7699)
Stop
valve
cover
(R7701)