![background image](http://html.mh-extra.com/html/daikin/2mks40g2v1b/2mks40g2v1b_service-manual_501075295.webp)
SiBE12-816_D
Outdoor Unit
Removal Procedure
284
12
Disconnect the
connectors from the
terminal board.
★
This illustration is for 40 class model as representative.
Refer to page 51 for detail.
[S20]: electronic expansion
valve coil for room A
[S21]: electronic expansion
valve coil for room B
[S40]: overload protector
[S70]: fan motor
[S80]: four way valve coil
[S90]: thermistors
[S91]: gas pipe thermistor
[S92]: liquid pipe thermistor
13
Remove the 2 screws
and remove the
radiation fin.
Step
Procedure
Points
[S70]
[S40] [S92]
[S91] [S20]
[S21]
[S90]
[S80]
(R12566)
(R7608)
(R7609)