![Daedong EX50-SA Manual Download Page 35](http://html.mh-extra.com/html/daedong/ex50-sa/ex50-sa_manual_496870035.webp)
1
SAFETY PRE CAUTIONS
1
-
23
and shaking during transport and
work that could jeopardize the
stability of the tractorimplement as-
sembly.
• The cardan shaft must be always
CE-marked, provided with suitable
guards and suitable to tractor-imple-
ment coupling. Follow all directions
of the operation manual, concerning
both the fastening according to con-
nection direction and safety rules to
avoid rotation of protections (chains)
and overlaying of the telescopic
tubes. Also keep articulation angles.
WARNING
•
When a tractor with safety
frame is equipped with a front
loader, there is still a risk if the
implement is improperly used.
This risk is due to objects fall-
ing from above. The operator
has no protection against this
risk.
To reduce risks, the following precau-
tions should be used.
- Only use loader equipped with a
load self-levelling system, i.e. of the
parallelogram type.
- Only use specific implements for
the operation to be performed.
Strictly follow the directions and
warnings in the loader's operation
manual.
- Use the machine and the imple-
ment with caution, drive on plane
ground and avoid pits, excavations
and ditches. Do not turn, start or
stop abruptly.
- If a front loader is mounted, it is
advisable to use a tractor with cab
or with a 4-post frame with FOPS
safety system. The loader installer
should carefully analyze all risks
and make all required adjustments.
• Hitch loads to the drawbar only.
Towing or attaching to other loca-
tions may cause the tractor to over-
turn.
• Improper use of the drawbar, even
if correctly positioned, can cause a
rear overturn.
• DO NOT overload an attachment or
towed equipment. Use proper coun-
terweights to maintain tractor stabili-
ty. Hitch heavy loads to the drawbar
only.
TG2O111A
TE150 (EX50, EX55)-���-01.indd 23
2019-03-19 �� 2:45:47
Summary of Contents for EX50-SA
Page 2: ...TE150 EX50 EX55 00 indd 2 2019 03 19 6 46 03 ...
Page 12: ...TE150 EX50 EX55 00 indd 12 2019 03 19 6 46 04 ...
Page 54: ...MEMO MEMO TE150 EX50 EX55 03 indd 10 2019 03 19 4 29 19 ...
Page 138: ...MEMO MEMO TE150 EX50 EX55 06 indd 16 2019 03 19 2 31 36 ...
Page 178: ...MEMO MEMO TE150 EX50 EX55 07 indd 40 2019 03 19 4 36 33 ...
Page 189: ...10 10 INDEX INDEX 10 2 TE150 EX50 EX55 10 indd 1 2019 03 19 7 00 24 ...
Page 196: ...TE150 EX50 EX55 10 indd 8 2019 03 19 7 00 24 ...