CUB CRAFTERS, INC.
CC11-160 MAINTENANCE MANUAL
6.3.8
Manual number SSC10000AMM
Page: 12
Date: 10/28/2010
(1)
REMOVAL
(a) Drain hydraulic fluid from system.
(b) Disconnect brake line from 90° Brass Poly-Flow Fitting (4).
(c) Remove Cotter Pins (10) (11) from Clevis Pins (8) (9).
(d) Remove Clevis Pins (8) (9) and AN960-10 Washers (12).
(e) Remove Master Cylinder (1) and attached components.
(2) INSPECTION
(a) Inspect Master Cylinder (1) for signs of leaks, cracks, or any other damage.
(b) Inspect Brake Reservoir (6) for signs of leaks, cracks, or any other damage.
(c) Inspect all fittings (2) (3) (4) (5) for signs of leaks, cracks, or any other damage.
(3) INSTALLATION
See Figure 6.3.8.4
(a) Ensure center to center distance of bottom hole to upper hole on Master Cylinder
(1) is 5.125”. Adjust distance as required by twisting nut on Master Cylinder arm.
(b) Ensure Master Cylinder lock nut is tight.
(c) Locate Master Cylinder (1) on rudder pedal as shown in figure 6.3.8.4.
(d) Insert Clevis Pin (9) thru rudder pedal, AN960-10 Washers (12), and bottom of
Master Cylinder (1).
(e) Insert Clevis Pin (8) thru rudder pedal and top of Master Cylinder (1) arm.
(f) Secure both clevis pins (8) (9) with Cotter Pins (10) (11).
(g) Connect brake line to 90° Brass Poly-Flow Fitting (4).
(h) Fill brake system with MIL-H-5606 hydraulic fluid. Bleed system carefully
ensuring no air is left in the brake lines. Top off Brake Reservoir (6) making sure
that it is a minimum of ¾ full.
Summary of Contents for CARBON CUB SS CC11-160
Page 2: ...INTENTIONALLY LEFT BLANK...
Page 23: ...CHAPTER 5 AIRCRAFT MAINTENANCE MANUAL...
Page 24: ...INTENTIONALLY LEFT BLANK...
Page 115: ...CHAPTER 6 LINE MAINTENANCE REPAIRS AND ALTERATIONS...
Page 116: ...INTENTIONALLY LEFT BLANK...
Page 325: ...CHAPTER 7 HEAVY MAINTENANCE REPAIRS AND ALTERATIONS...
Page 326: ...INTENTIONALLY LEFT BLANK...
Page 331: ...CHAPTER 8 OVERHAUL...
Page 332: ...INTENTIONALLY LEFT BLANK...
Page 339: ...CHAPTER 9 MAJOR REPAIRS AND ALTERATIONS...
Page 340: ...INTENTIONALLY LEFT BLANK...
Page 345: ...CHAPTER 10 TASK SPECIFIC TRAINING...
Page 346: ...INTENTIONALLY LEFT BLANK...
Page 351: ...CHAPTER 11 SAFETY DIRECTIVES COMPLIANCE...
Page 352: ...INTENTIONALLY LEFT BLANK...