![CTC Union EcoZenith i555 Pro 1x230V Installation And Maintenance Manual Download Page 46](http://html.mh-extra.com/html/ctc-union/ecozenith-i555-pro-1x230v/ecozenith-i555-pro-1x230v_installation-and-maintenance-manual_2693358046.webp)
46
CTC EcoZenith i555 Pro
7.7.5
Stored Operation data
Menu: "Operation data/Stored Operation data"
This menu shows cumulative operation values.
The operation values shown in the menu screenshots
are only examples. The historical operational info
presented varies depending on the language choice.
Total operation time h
3500
Shows the total time the product has been powered.
Max primary flow °C
51
Shows the highest temperature that has been supplied
to the heating circuit.
El. heat (kWh)
250
Shows how much additional heat has been used.
Energy output (kWh)
10000
Estimated energy emitted from the heat pump.
The value is presented only for language choices
"Norwegian" and "German".
(The value is not calculated for models CTC GSi 600,
CTC EcoPart 600, CTC EcoAir 600, these are given the
value 0).
Operation time /24 h:m
07:26
Shows total operating time during the last 24 hours.
Starts /24 h
15
Shows the number of starts in the last 24 hours.
Summary of Contents for EcoZenith i555 Pro 1x230V
Page 2: ......
Page 3: ...162 505 72 1 2020 09 22 Installation and Maintenance Manual CTC EcoZenith i555 Pro ...
Page 152: ...152 CTC EcoZenith i555 Pro 18 Wiring diagram relay card 3x400V ...
Page 153: ...153 CTC EcoZenith i555 Pro ...
Page 154: ...154 CTC EcoZenith i555 Pro 19 Wiring diagram relay card 1x230V ...
Page 155: ...155 CTC EcoZenith i555 Pro ...
Page 156: ...156 CTC EcoZenith i555 Pro 20 Wiring diagram relay card 3x230V ...
Page 157: ...157 CTC EcoZenith i555 Pro ...
Page 158: ...158 CTC EcoZenith i555 Pro 21 Wiring diagram for expansion card ...
Page 167: ...167 CTC EcoZenith i555 Pro ...