![CTC Union EcoZenith i555 Pro 1x230V Installation And Maintenance Manual Download Page 115](http://html.mh-extra.com/html/ctc-union/ecozenith-i555-pro-1x230v/ecozenith-i555-pro-1x230v_installation-and-maintenance-manual_2693358115.webp)
115
CTC EcoZenith i555 Pro
11. Transportation, unpacking and installation
!
The product must
be transported and
stored in an upright
position.
Left rear insulation
Recesses in the front insulation
Right rear insulation
This section is intended for the technician responsible for one or more of the
installations necessary for the CTC EcoZenith i555 Pro to perform according to
the property owner's wishes. Take your time going through functions and settings
with the property owner and answer any questions. Both you and the CTC
EcoZenith i555 Pro benefit from ensuring the user has completely understood
how the system operates and should be maintained.
11.1
Transportation
Transport the unit to the installation site before removing the packaging.
Handle the CTC EcoZenith i555 Pro in one of the following ways:
• Forklift.
• Lifting eye which is fitted in the socket in the middle of the CTC EcoZenith
i555 Pro top.
• Lifting band around the pallet. NB: Can only be used with the packaging on.
• Remember that the product has a high centre of gravity and should be
handled with caution.
11.2
Unpacking
When the CTC EcoZenith i555 Pro has been placed at the installation site, the
packaging can be removed. Check that the product has not been damaged in
transit. Report any transport damage to the carrier.
11.3
Fitting rear insulation and plastic top cover
The rear insulation sections and top cover should be fitted before the CTC
EcoZenith i555 Pro is placed against a wall or in a corner for pipe and electrical
connection. These parts are delivered separately and they are easier to fit if
there is space around the unit.
Begin with the left rear insulation. Turn out the insulation, locate it in the
recesses in the front insulation and then turn it in against the tank. Repeat this
procedure for the right rear insulation. Note that the right rear insulation needs
to be turned out quite a lot for it to locate easily in the recesses.
Summary of Contents for EcoZenith i555 Pro 1x230V
Page 2: ......
Page 3: ...162 505 72 1 2020 09 22 Installation and Maintenance Manual CTC EcoZenith i555 Pro ...
Page 152: ...152 CTC EcoZenith i555 Pro 18 Wiring diagram relay card 3x400V ...
Page 153: ...153 CTC EcoZenith i555 Pro ...
Page 154: ...154 CTC EcoZenith i555 Pro 19 Wiring diagram relay card 1x230V ...
Page 155: ...155 CTC EcoZenith i555 Pro ...
Page 156: ...156 CTC EcoZenith i555 Pro 20 Wiring diagram relay card 3x230V ...
Page 157: ...157 CTC EcoZenith i555 Pro ...
Page 158: ...158 CTC EcoZenith i555 Pro 21 Wiring diagram for expansion card ...
Page 167: ...167 CTC EcoZenith i555 Pro ...