![CTC Union EcoZenith i555 Pro 1x230V Installation And Maintenance Manual Download Page 166](http://html.mh-extra.com/html/ctc-union/ecozenith-i555-pro-1x230v/ecozenith-i555-pro-1x230v_installation-and-maintenance-manual_2693358166.webp)
166
CTC EcoZenith i555 Pro
25.2.1 Getting started
Define system
• The EcoZenith senses whether primary flow sensors 1 and 2 and room
sensors 1 and 2 are connected and if so, automatically defines heating
circuits 1 and 2 “Yes” with the associated room sensor “Yes”.
• Scroll further down in the menu and select the connected systems with
“Yes”. The electric heaters are factory set to “Yes”.
• For heat pump operation, the pumps in question are defined 1–3 by
selecting “Yes”. For the relevant heat pump, the type of heat pump
must then be selected, EcoPart or EcoAir, followed finally by selection
of relay-controlled or speed-controlled (PWM) charge pump.
Operation data
• Check whether heat is needed in the upper and lower tank Heat is
needed when the temperature in the upper or lower tank is 5°C below
the setpoint in brackets. When this occurs, start-up of the compressor
should be delayed 10 minutes. Information on this is available in the
main menu. Return to the main menu to check.
Summary of Contents for EcoZenith i555 Pro 1x230V
Page 2: ......
Page 3: ...162 505 72 1 2020 09 22 Installation and Maintenance Manual CTC EcoZenith i555 Pro ...
Page 152: ...152 CTC EcoZenith i555 Pro 18 Wiring diagram relay card 3x400V ...
Page 153: ...153 CTC EcoZenith i555 Pro ...
Page 154: ...154 CTC EcoZenith i555 Pro 19 Wiring diagram relay card 1x230V ...
Page 155: ...155 CTC EcoZenith i555 Pro ...
Page 156: ...156 CTC EcoZenith i555 Pro 20 Wiring diagram relay card 3x230V ...
Page 157: ...157 CTC EcoZenith i555 Pro ...
Page 158: ...158 CTC EcoZenith i555 Pro 21 Wiring diagram for expansion card ...
Page 167: ...167 CTC EcoZenith i555 Pro ...