7
CONTACT CSI FOR MORE INFORMATION | CSIDESIGNS.COM | [email protected] | +1.417.831.1411
INSTALLATION
The Compact CIP control cabinet arrives mounted to the skid and prewired to
instruments installed on the skid . Typical installation requires a dedicated 480V
3-Phase with Branch Circuit Protection with amperage requirement based on
system configuration: 20 Amps without electric heat, 57 Amps with electric
heater option . Electrical schematics provided with the control panel indicate
the location, voltage and amperage requirement for the panel . The Compact
CIP system is designed to work as a standalone system and does not require
integration with the plant’s infrastructure .
To avoid electrocution, ALL electrical work should be done by a registered
electrician, following industrial safety standards and local codes . All power
must be OFF and safely locked out during installation .
DISCLAIMER OF LIABILITY
CSI does not assume responsibility and expressly disclaims liability for loss,
damage, or expenses that arise in any way from the installation, operation,
use, or maintenance performed in accordance with this manual . CSI assumes
no responsibility for any infringement of patents or other rights of third parties
that may result from use of the module . No license is granted by implication or
otherwise under any patent or patent rights .
CSI reserves the right to make changes to the product, specifications, or this
manual without prior notice
AIR CONNECTIONS
Note:
CSI recommends that the control cabinet be supplied with clean
instrument air at the minimum pressure of 90 psig .
AIR INPUT TO CABINET
Air connection 1/2” NPT Female
WARNING