![Cray ClusterStor L300 Installation Manual Download Page 29](http://html1.mh-extra.com/html/cray/clusterstor-l300/clusterstor-l300_installation-manual_2680121029.webp)
Figure 15. ClusterStor L300 and L300N PDU Options, Top Feed
50A 208V
US
PX2-5100X2-V2
C19 (A1)
C19 (A2)
C19 (A3)
C19 (B4)
C19 (B5)
C19 (B6)
C19 (A7)
C19 (A8)
C19 (A9)
C19 (B10)
C19 (B11)
C19 (B12)
Line A
Line B
32A 415V
EMEA
PX2-5104X2-V2
C19 (A1)
C19 (A2)
C19 (A3)
C19 (B4)
C19 (B5)
C19 (B6)
C19 (A7)
C19 (A8)
C19 (A9)
C19 (B10)
C19 (B11)
C19 (B12)
Line A
Line B
PX2-5965X3-V2
24A 208V
US
C19 (A1)
C19 (A2)
C19 (A3)
C19 (B4)
C19 (B5)
C19 (B6)
C19 (C7)
C19 (C8)
C19 (C9)
Line A
Line B
Line C
60A 208V
US
PX2-5551-N4V
Line A
C13 (A1)
C13 (A2)
C19 (A3)
C19 (A4)
C13 (A5)
C13 (A6)
C19 (A7)
C19 (A8)
C13 (A9)
C13 (A10)
C19 (A11)
C19 (A12)
C13 (A13)
C13 (A14)
C19 (A15)
C19 (A16)
C13 (A17)
C13 (A18)
C19 (A19)
C19 (A20)
C13 (A21)
C13 (A22)
C19 (A23)
C19 (A24)
Cable the External Power Connections
29