
REF C04717-02-91 Q-NRG User Manual, Edition 4.2
Chapter 3 - Q-NRG Operation
COSMED srl
Schofield
[Schofield WN. Predicting basal metabolic rate, new standards and review of
previous work. Hum Nutr Clin Nutr 1985; 39:5–41]
WHO/FAO/UNU
[FAO/WHO/UNU, “Energy and protein requirements: report of a joint FAO/WHO/UNU
expert consultation,” World Health Organization Technical Report Series, vol. 724,
pp. 1–206, 1985]
Maintenance
Maintenance menu shows details about the maintenance performed on the device.
Further information about Preventive Maintenance and O2 Sensor Installation can be found in “Chapter 5 -
Maintenance” of this manual.
Field
Description
Pneumatic Cartridge Date
Allow the user to manually set date of the last pneumatic cartridge installation
Pneumatic Cartridge LOT
Specify pneumatic cartridge LOT#
O2 Sensor Installation Date
Allow the user to manually set date of last O2 sensor installation
O2 Sensor S/N
Specify O2 sensor S/N
Summary of Contents for Q-NRG
Page 1: ...Q NRG User Manual...
Page 2: ......
Page 32: ...30 148 REF C04717 02 91 Q NRG User Manual Edition 4 2 COSMED srl...
Page 40: ...38 148 REF C04717 02 91 Q NRG User Manual Edition 4 2 COSMED srl...
Page 86: ...84 148 REF C04717 02 91 Q NRG User Manual Edition 4 2 COSMED srl...
Page 121: ...119 148 REF C04717 02 91 Q NRG User Manual Edition 4 2 Appendix COSMED srl Appendix...
Page 148: ...146 148 REF C04717 02 91 Q NRG User Manual Edition 4 2 Appendix COSMED srl Notes...
Page 149: ...147 148 REF C04717 02 91 Q NRG User Manual Edition 4 2 Appendix COSMED srl...
Page 150: ...148 148 REF C04717 02 91 Q NRG User Manual Edition 4 2 Appendix COSMED srl...
Page 151: ......