4.2.2
Installation of the post-evaporation unit
The components of the post-evaporation unit are supplied separately and
must be assembled at the installation site.
The following sections explain the general installation of the post-evaporation
unit. Detailed information (dimensions, fastening points, etc.) can be found
in the “
installation drawing
” supplied with your particular system.
Important!
The dimensions
listed in the installation drawing
are manda
-
tory
.
The
post-evaporation unit
comprises the following main components:
Flow direction
A
One
,
two
or
three
cross arms (depending on the size
of the system) each consisting of: 2 wall supports
and a U-section, screwed together.
B
One vertical section
on each side of the duct
(the
openings of the sections facing the duct wall).
Note:
The left vertical section is marked with an
engraved “
L
” while the right vertical section carries
an engraved “
R
”.
C
Two
or
more vertical sections “large”
Note:
These vertical sections are marked with an
engraved “
M
”.
D
Upper flow sheets
E
Upper angle bracket
F
Upper plate sealings
G
Lateral flow sheets left
H
Lateral plate sealings
I
Ceramic plates (post-evaporation elements)
J
Lower plate sealings
K
Lower flow sheets
L
Drain-off sheets
M
Lateral flow sheets right
N
Tub sealing
–
Anti-drip sheets
(not visible)
–
Lower angle bracket
(not visible)