LBC-4000 L-Band Up/Down Converter System
Revision 6
Introduction
1–4
MN-LBC-4000
1.3
Converter Features
1.3.1 Physical Description
For:
See:
Rack installation and mounting
instructions
Chapter 3. INSTALLATION
AND
STARTUP
Cabling Connections
Chapter 4. REAR PANEL
CONNECTORS
Firmware Updating Instructions
Chapter 5. FIRMWARE UPDATE
Local control operating
instructions and procedures
Chapter 6. FRONT PANEL
OPERATION
Remote control operating
instructions and procedures
Chapter 7. ETHERNET INTERFACE
OPERATION and
Chapter 8. SERIAL INTERFACE
OPERATION
Maintenance procedures
Appendix A. UP/DOWN
CONVERTER IDU MODULE
REMOVAL / RE-INSTALLATION
Redundant system operating
instructions and procedures
Appendix B. REDUNDANCY
OPERATION
The LBC-4000/-ST features a 1RU-high (1.75”) 19-inch wide chassis that is designed for rack
mounting into a standard 19-inch (48.26 cm) equipment rack. The unit may also be mounted into
the rack using the provided slide mechanisms to allow service without removal from the rack. The
unit may be freestanding if desired.
The LBC
‐
4000 drop
‐
down front panel provides access to the ON/OFF switch and installation bays
for two Up Converter modules, two Down Converter modules, or one of each.
All operator controls, indicators and displays are located on the LBC
‐
4000-ST front panel.
External interface connectors, including those intended for Ethernet or Serial Remote M&C, are
located on the LBC
‐
4000-ST rear panel.