![Club Car FE 350 Maintenance And Service Supplement Download Page 251](http://html1.mh-extra.com/html/club-car/fe-350/fe-350_maintenance-and-service-supplement_2626732251.webp)
UNITIZED TRANSAXLE
Unitized Transaxle Installation
18
20. Install three wire ties to secure the engine kill wire to the accelerator cable where they both route together on the
passenger side of the engine.
571
Figure 18-42
Shock Absorber
569
Figure 18-43
Ignition Kill Wire
21. Connect the oil level sensor wire (18-gauge yellow) to the jumper wire
22. Connect the 6-gauge white wire to the F2 post, the 6-gauge black ground wire to the A2 post and tighten both
wires to 48 in-lb (5.4 N·m). Connect the 16-gauge yellow wire to the DF post on the starter/generator and tighten
to 30 in-lb (3.4 N·m)
.
DF
F2
1
2
3
1. Yellow Wire 2. White Wire 3. Ground Wire at A2 Terminal
568
Figure 18-44
Oil Level Sensor Jumper wire
836
Figure 18-45
Starter/Generator
23. Position the shifter cable in the shifter cable mounting bracket on the engine and tighten the mounting nuts to 22
ft-lb (29.8 N·m). Connect shifter cable rod end to the shifter arm
24. Attach the ground wire to the mounting screw on the oil filler tube mounting bracket and tighten to 50 in-lb
(5.7 N·m)
.
2009 FE 350 Maintenance and Service Supplement
Page 18-17