SERVICE MANUAL
–
Post eVolve Smart
13 - MAINTENANCE
CIRCONTROL, S.A.
–
Innovació, 3
–
08232
–
Viladecavalls (Barcelona)
Tel.: +34 937 362 940
–
Fax: +34 937 362 941
81
Web: www.circontrol.com
–
E-mail:
13
MAINTENANCE
The Charge Point needs regular maintenance and components inspection during its
lifespan.
Before starting the maintenance or a component replacement procedure, disconnect the
Charge Point from any power source.
Pay attention to the following symbols to prevent electrical hazard.
When performing some inspection and service at the equipment, except if it is necessary,
make sure that all circuit breakers are switch OFF before start working.
The Charge Point contains electric, mechanical and consumable components that shall
be periodically checked, in order to keep the properly performance of the Charge Point
and keep it in the best conditions throughout its useful lifetime.
This section specifies how to perform the preventive maintenance, its frequency and the
components that shall be verified.
Please, see the “Wear check list
AC Charge Point
s” in the “13.1
-
Verification documents”
section to perform the first inspection of the Charge Point.
To carry out the p
reventive maintenance, please see the “Preventive maintenance AC
Charge Point
s” list
in the “
” section
.
The maintenance plan is based on years from the start-up, hours of charging or standby,
and cycles of charging. Depending on the group of components, it is necessary to apply
a specific maintenance timing. Check the periods in the tables below:
Maintenance
6 months 1 year 2 years 3 years 4 years 5 years
Wear-check inspection
Preventive maintenance
Standard intervals.
Special intervals for very dusty environments as deserts. Repeat the interval of
period indicated after each task of maintenance.