Installation Guide for FibeAir IP-20C-HP
Page 29 of 204
Ceragon Proprietary and Confidential
3.
Grounding the IP-20C-HP Unit
List of Items
Table 11: Grounding Cable
Marketing Model
Marketing Description
Quantity
CBL-GND
GROUND CABLE FOR IDU and ODU
1
Required Tools
•
Metric offset wrench key wrench #3
•
Metric wrench 10mm
Procedure
1 On the front of each IP-20C-HP unit, loosen the nut, plain washer, and
serrated washer from the GND stud, using the metric offset hexagon key and
the wrench.
2 Place the cable lug (supplied with the IP-20C-HP grounding kit) in place on the
screw.
3 Secure the cable lug.
4 The second side of the GND cable should be connected to the main ground
bar or terminal ground bar of the site.
5 Perform a resistance test between the 2 lugs of the GND cable. Verify that the
result is 0-2 ohms.