Installation Guide for FibeAir IP-20C-HP
Page 124 of 204
Ceragon Proprietary and Confidential
O-Rings (Dual
Coupler/Splitter)
M8 Screws
(4 on each Diplexer)
Note:
The screws should be tightened diagonally. Fasten the
upper right screw of the top Diplexer and then the lower left
screw of the bottom Diplexer, then fasten the upper left
screw of the top Diplexer and then the lower right screw of
the bottom Diplexer. Once the outer screws have all been
partially tightened (torque ??), repeat this process in a
similar fashion with the central screws. Then proceed to
fully tighten all the screws in the same order.