Sourcing and Sinking
All inputs on the Oak Board can be configured in banks of 4 for sourcing or sinking operation. Whether you will use sinking or
sourcing depends on your devices. The inputs can use 5, 12 or 24 VDC, be sure to install the appropriate SIP resistor. The inputs
are arranged in groups of four with a common shared by each input in a group.
•
Sourcing:
Connecting the inputs to power is sourcing. The negative lead of the power supply must be connected to
common. This is demonstrated on inputs 13-16 in Figure 5.2.3.
•
Sinking:
Connecting the inputs to ground is sinking. The positive lead of the power supply must be connected to
common. This is demonstrated on inputs 9-12 in Figure 5.2.3.
Page 34 of 86
Chapter 5 Electrical Cabinet Wiring
Figure 5.2.3
Sinking vs Sourcing
Summary of Contents for 13126
Page 1: ...CENTROID Oak Board Install Manual Last revised 6 3 2021 Page 1 of 86...
Page 10: ...1 3 OVERVIEW Page 10 of 86 Chapter 1 What s included...
Page 22: ...Page 22 of 86 Chapter 3 Software Installation...
Page 41: ...Page 41 of 86 Electrical Cabinet Wiring Figure 5 8 1 Sample VFD Wiring...
Page 42: ...Page 42 of 86 Electrical Cabinet Wiring Figure 5 8 2 Spindle Wiring...
Page 63: ...APPENDIX B TECHNICAL INFORMATION...
Page 64: ......
Page 65: ......
Page 66: ......
Page 67: ......
Page 68: ......
Page 69: ......
Page 70: ......
Page 71: ......
Page 72: ......
Page 73: ......
Page 74: ......
Page 75: ......
Page 76: ......
Page 77: ......
Page 78: ......
Page 79: ......
Page 80: ......
Page 81: ......
Page 82: ......
Page 83: ...APPENDIX C 3RD PARTY DRIVE CABLE INFORMATION Yaskawa Drives Page 83 of 86 Appendices...
Page 84: ...Delta Drives Page 84 of 86 Appendices...