2.5 B
ENCH
T
EST
– P
OWERING
O
N
& V
ERIFYING
LED S
TATES
Before you begin:
Before powering on, verify that nothing metallic can touch the circuit boards and cause a short. Make sure all wiring is firmly in
place.
Switch the outlet strip on:
Powering the Oak Board and any accessories.
Oak Board Status LED states:
After 15-30 seconds the status LED's should all be solid on except for DEBUG, which should flash once per second, and DF,
which doesn't turn on until the software is installed.
Figure 2.5.1 shows where these status LED's are located.
If they are not all on, or the DSP DEBUG is flashing faster than once per second, refer to the table below for troubleshooting.
Page 15 of 86
Chapter 2 Connecting Components for a Bench Test
-1
2
L
E
D
5
L
E
D
3.
3
L
E
D
P
LC
O
K
D
F
F
P
G
A
O
K
D
B
U
G
D
S
P
O
K
Blinks once per second
+
12
L
E
D
Off Until
Connected
to Computer
ON
ON
ON
ON
ON
ON
ON
Figure 2.5.1
Status LEDs on the Oak Board
Blinks once per second
Summary of Contents for 13126
Page 1: ...CENTROID Oak Board Install Manual Last revised 6 3 2021 Page 1 of 86...
Page 10: ...1 3 OVERVIEW Page 10 of 86 Chapter 1 What s included...
Page 22: ...Page 22 of 86 Chapter 3 Software Installation...
Page 41: ...Page 41 of 86 Electrical Cabinet Wiring Figure 5 8 1 Sample VFD Wiring...
Page 42: ...Page 42 of 86 Electrical Cabinet Wiring Figure 5 8 2 Spindle Wiring...
Page 63: ...APPENDIX B TECHNICAL INFORMATION...
Page 64: ......
Page 65: ......
Page 66: ......
Page 67: ......
Page 68: ......
Page 69: ......
Page 70: ......
Page 71: ......
Page 72: ......
Page 73: ......
Page 74: ......
Page 75: ......
Page 76: ......
Page 77: ......
Page 78: ......
Page 79: ......
Page 80: ......
Page 81: ......
Page 82: ......
Page 83: ...APPENDIX C 3RD PARTY DRIVE CABLE INFORMATION Yaskawa Drives Page 83 of 86 Appendices...
Page 84: ...Delta Drives Page 84 of 86 Appendices...