7 - MAINTENANCE
14.
Lower the loader to place the wheels on the surface.
15.
Shut down the engine.
16.
Fill the axle at the center bowl check/fill plug and at
the planetary check/fill plugs to specification. Fluid
should just begin to flow out of the openings, when
at the proper level.
17.
Install the center bowl and the planetary check/fill
plugs.