
7 - MAINTENANCE
Loader hydraulic coupler lock pins
If equipped, grease the lock pins for the hydraulic coupler
every 50 hours of operation. Use
M
OLY
L
UBE
251 EP-M
grease.
NOTE:
There are two total fittings, one on each side.
RCPH10TLB269AAF
1
4 in 1 bucket pivots and grease fittings
Grease the pivots and fittings for the 4 in 1 bucket, if
equipped, every 50 hours of operation. Use
M
OLY
L
UBE
251 EP-M grease.
•
Bucket pivot - Two total, one on each side
RCPH10TLB258AAF
1
•
Cylinder, rod end - Two total, one on each side
RCPH10TLB258AAF
2
7-50
Summary of Contents for 570NXT
Page 8: ......
Page 24: ...1 GENERAL INFORMATION 1 16 ...
Page 88: ...3 CONTROLS INSTRUMENTS 3 28 ...
Page 142: ...6 WORKING OPERATIONS 6 34 ...
Page 193: ...7 MAINTENANCE Cylinder closed end Two total one on each side RCPH10TLB258AAF 3 7 51 ...
Page 252: ...7 MAINTENANCE 7 110 ...
Page 257: ...8 SPECIFICATIONS Machine overall dimensions 8 5 ...
Page 259: ...8 SPECIFICATIONS RAIL12UTL0182GA 1 8 7 ...
Page 260: ...8 SPECIFICATIONS 8 8 ...
Page 262: ...8 SPECIFICATIONS RAIL12UTL0182GA 2 8 10 ...
Page 272: ...9 ACCESSORIES 9 4 ...
Page 279: ......