6 - WORKING OPERATIONS
Lifting with the loader
WARNING
Equipment failure could cause accident or injury!
Only use rigging equipment that has the capacity to lift the loads that you are moving. Always check
the rigging equipment each day for damaged or missing parts. Make sure other workers or bystanders
are not under the load while it is moving.
Failure to comply could result in death or serious injury.
W0205A
NOTICE:
This machine is not a crane. Be very careful when lifting a load.
Use the lifting points when using the loader to lift a load.
RCPH10TLB275AAF
1
Changing loader attachments
The loader hydraulic coupler, if equipped, lets the operator
install and remove front end attachments without using
special tools or additional personnel.
RCPH10TLB268AAF
1
Install an attachment:
1. Tilt the loader hydraulic coupler forward and engage
the top coupler pins
(1)
in the attachment upper mount-
ing hooks
(2)
.
RCPH10TLB270AAF
2
6-23
Summary of Contents for 570NXT
Page 8: ......
Page 24: ...1 GENERAL INFORMATION 1 16 ...
Page 88: ...3 CONTROLS INSTRUMENTS 3 28 ...
Page 142: ...6 WORKING OPERATIONS 6 34 ...
Page 193: ...7 MAINTENANCE Cylinder closed end Two total one on each side RCPH10TLB258AAF 3 7 51 ...
Page 252: ...7 MAINTENANCE 7 110 ...
Page 257: ...8 SPECIFICATIONS Machine overall dimensions 8 5 ...
Page 259: ...8 SPECIFICATIONS RAIL12UTL0182GA 1 8 7 ...
Page 260: ...8 SPECIFICATIONS 8 8 ...
Page 262: ...8 SPECIFICATIONS RAIL12UTL0182GA 2 8 10 ...
Page 272: ...9 ACCESSORIES 9 4 ...
Page 279: ......