
28
TO VIEW AND CHANGE SET POINTS (Fig. 23)
1. To view the SETPOINT table, from the MENU screen
press .
2. There are 5 set points on this screen: BASE DEMAND
LIMIT, LCW SETPOINT (leaving chilled water set
point), ECW SETPOINT (entering chilled water set
point), ICE BUILD SETPOINT, and TOWER FAN
HIGH SETPOINT. Only one of the chilled water set
points can be active at one time. The set point that is ac-
tive is determined from the SERVICE menu. The ECW
option is activated on the TEMP_CTL screen and Ice
Build is enabled on the OPTIONS screen. See the Service
Operation section, page 63. The ice build (ICE BUILD)
function is also activated and configured from the SER-
VICE menu.
3. Press
or
to highlight the desired
set point entry.
4. Press
to modify the highlighted set point.
5. Press
or
to change the select-
ed set point value.
6. Press
to save the changes and return to the previ-
ous screen.
SERVICE OPERATION — To view the menu-driven pro-
grams available for Service Operation, see Service Operation
section, page 63. For examples of ICVC display screens, see
Table 3.
SETPOINT
19XR_II
SETPOINT SELECT
SETPOINT
Base Demand Limit
Control Point
LCW Setpoint
ECW Setpoint
ICE BUILD Setpoint
Tower Fan High Setpoint
100%
50.0 F
60.0 F
40.0 F
85.0 F
Fig. 23 — Example of Set Point Screen
NEXT
PREVIOUS
SELECT
INCREASE
DECREASE
ENTER
Summary of Contents for AquaEdge 19XR series
Page 69: ...69 Fig 33 19XR Leak Test Procedures a19 1625 ...
Page 154: ...154 Fig 64 Benshaw Inc Wye Delta Unit Mounted Starter Wiring Schematic Low Voltage a19 1873 ...
Page 161: ...161 Fig 69 Typical Low Voltage Variable Frequency Drive VFD Wiring Schematic 575 v ...
Page 162: ...162 Fig 69 Typical Low Voltage Variable Frequency Drive VFD Wiring Schematic 575 v cont ...
Page 186: ...186 APPENDIX B LEAD LAG WIRING 19XR Lead Lag Schematic Series Cooler Flow a19 1655 ...
Page 187: ...187 APPENDIX B LEAD LAG WIRING cont 19XR Lead Lag Schematic Parallel Cooler Flow a19 1717 ...