OPERATION
WA R N I N G
!
APPLICATOR OPERATION
1. Set fluid pressure using flow regulator.
2. Disconnect the air to the applicator.
3. Activate trigger to start material stream into
grounded
metal bucket or suitable area
.
4. Release trigger stop material flow.
1 - Fluid Supply
2 - Flow Regulator
6.9 bar (100psig) Max
1
2
OR...
The bucket or area sprayed into must be
grounded to true earth ground.
AH-17-02-R1 (10/2019)
20 / 55
www.carlisleft.com
OPERATION
EN