Chapter 6: Installation Procedures per Configuration Type
MultiCore 2+2 HSB Double Polarization Direct
Mount
phn-3962 004v000
Page 6-22
109B
5 Connect the MIMO signaling cable between the management ports of both units. For
additional instructions on preparing and connecting this cable.
protection signaling cable on page