34
pipe square. De-burr the cut edge of the
plastic pipe with a file, razor blade or fine
sandpaper.
vi.
Reinstall the inner pipe.
e. To join Concentric Vent Pipe refer to Figure 21
“Joining Cuttable Pipe” and Figure 22 “Joining
Non-Cuttable Pipe” and follow the procedure
below:
i.
Start assembly of the vent system at the
boiler. Lubricate the brown gasket in the
boiler vent collar with a few drops of water.
ii.
Push the male end of the first fitting into the
boiler collar until it bottoms out. The male
end of cuttable sections should go 1” into
the collar until the insertion mark (made in
Step 4 above) is covered. On other fittings,
the bead on the male pipe will be bottom out
on the collar (see Figure 22).
iii.
The male end of cuttable fittings must be
held to the collar with three (3) #10 x 1/2”
sheet metal screws. Drill a 1/8 hole through
both outer pipes to start this screw.
Use a
drill stop or other means to ensure that
the drill bit does not penetrate more than
3/8” into the outer pipe. Do not use a
sheet metal screw longer than 1/2”
(see
Figure 21).
iv.
Use locking bands (provided with all
fittings) to secure non-cuttable pipe, as well
as fittings, to the boiler collar (see Figure
22).
iV. Venting
E. Concentric Polypropylene Venting (continued)
Figure 20: Cutting Straight Pipe
Figure 21: Joining Cuttable Pipe
Figure 22: Joining non-Cuttable Pipe
Summary of Contents for Apex APX399
Page 65: ...65 VIII Electrical continued Figure 43 Ladder Diagram ...
Page 66: ...66 VIII Electrical continued ...
Page 67: ...67 Figure 44 Wiring Connections Diagram VIII Electrical continued ...
Page 110: ...110 1P 3 1P 2 1P 1 XIII Repair Parts continued 1C 1D 1E ...
Page 116: ...116 XIII Repair Parts continued ...
Page 118: ...118 XIII Repair Parts continued ...
Page 129: ...129 SERVICE RECORD DATE SERVICE PERFORMED ...
Page 130: ...130 SERVICE RECORD DATE SERVICE PERFORMED ...