124
Figure
number
Page
number Description
Section I - Product Description, Specifications & Dimensional Data
Figure 1A
7
Model APX399
Figure 1B
8
Model APX500
Figure 1C
9
Model APX800
Section iii - Pre-installation and Boiler Mounting
Figure 2
12
Clearances To Combustible and Non-combustible Material
Figure 3
14
Stacking Boiler Attachment Bracket Placement
Section iV - Venting
Figure 4
17
Location of Vent Terminal Relative to Windows, Doors, Grades, Overhangs, Meters and Forced Air
Inlets (Concentric Terminal Shown - Two-Pipe System Vent Terminal to be installed in same location
Two-Pipe System Air Intake Terminal Not Shown)
Figure 5
20
Expansion Loop and Offset
Figure 6
21
Field Installation of CPVC/PVC Two-Pipe Vent System Connector
Figure 7
21
Near-Boiler Vent/Combustion Air Piping
Figure 8
23
Wall Penetration Clearances for PVC Vent Pipe
Figure 9A
23
Direct Vent - Sidewall Terminations
Figure 9B
24
Direct Vent - Sidewall Terminations (Optional)
Figure 10
24
Rodent Screen Installation
Figure 11
24
Direct Vent - Optional Sidewall Snorkel Terminations
Figure 12
25
Direct Vent - Vertical Terminations
Figure 13
26
Direct Vent - Vertical Terminations w/ Sloped Roof
Figure 14
28
Vent System Field Modification to Install PVC to PP Adapter (M&G/DuraVent Shown)
Figure 15
29
Flexible Vent in Masonry Chimney with Separate Air Intake
Figure 16
31
Field Installation of Two-Pipe Vent System Adapter for Stainless Steel
Figure 17
33
Field Installation of Boiler Concentric Vent Collar
Figure 18
33
Cut-To-Length Extension (Cuttable)
Figure 19
33
Fixed Extension (Non-Cuttable)
Figure 20
34
Cutting Straight Pipe
Figure 21
34
Joining Cuttable Pipe
Figure 22
34
Joining Non-Cuttable Pipe
Figure 23
35
Horizontal Concentric Venting
Figure 24
35
Dimension “L”
Figure 25
36
Cutting Vent Terminal Pipe
Figure 26
37
Completing Horizontal (Wall Terminal Installation)
Figure 27
37
Vertical Concentric Vent Installation
Figure 28
37
Dimension “H”
Figure 29
38
Cutting Vertical Terminal
Figure 30
38
Completing Vertical Terminal Installation
Figure 31
39
Chimney Chase Installation
Figure 32
41
Multiple Boiler Direct Vent Termination
appendix a - Figures
Summary of Contents for Apex APX399
Page 65: ...65 VIII Electrical continued Figure 43 Ladder Diagram ...
Page 66: ...66 VIII Electrical continued ...
Page 67: ...67 Figure 44 Wiring Connections Diagram VIII Electrical continued ...
Page 110: ...110 1P 3 1P 2 1P 1 XIII Repair Parts continued 1C 1D 1E ...
Page 116: ...116 XIII Repair Parts continued ...
Page 118: ...118 XIII Repair Parts continued ...
Page 129: ...129 SERVICE RECORD DATE SERVICE PERFORMED ...
Page 130: ...130 SERVICE RECORD DATE SERVICE PERFORMED ...