Preventative Maintenance Instructions
These instructions correspond with the Preventative Maintenance Checklist. The last part of
this document are instructions for replacing ball valves, pumps, and carriage.
Start-up Instructions:
● Nozzle Replacement
○ There are two types of nozzles look at the bottom of the nozzles before placing
them in a Quick Connect Adapter.
■ The nozzle with the number
6502
written on the bottom goes to the
green
Quick Connect Adapter.
■ The nozzle with the number
4001
goes to the
red
Quick Connect Adapter
■ Remember that each nozzle needs a gasket (the black, rubber piece),
which is placed in the Quick Connect Adapter after the nozzle.
■ For more information see page 54 of the User Manual
■ The placement of the nozzles are also crucial. See the diagram below
● Bleeding Pumps
○ If you want this process to be automated:
■ Create a Maintenance task for each pump (if there aren’t any created
already)
● Go to the
Maintenance Screen
● The pretreater came with bleed tasks already in the system. Verify
that you have the following tasks under “
MAINTENANCE
” on the
right side and that there is a
green check mark
next to each one:
○ “POWER ON BLEED 1”
○ “POWER ON BLEED 2”
○ “POWER ON BLEED 3”
○ “POWER ON BLEED 4”
○ “POWER ON BLEED 5”
● If these tasks aren’t on your list, add a task for each pump
○ Task: Bleed
Addendum: Synergy Maintenance Page 1