Synergy Software Page 13
the
Carriage
. Typical times are between 5 and 20
seconds.
• Flush Line Iterations
: During a
Flush Operation
as
defined in the
Pretreat Maintenance Card
Section
This indicates how many cycles the system will spend
filling with water, and how many cycles the system
will spend filling with pretreat.
• Fill Tank Iterations
: During a
Fill Line With
Pretreat Operation
as defined in the
Pretreat
Maintenance Card
Section. This indicates how
many cycles the system will spend filling with
pretreat.
• Empty Tank Iterations
: During a
Fill Line With
Water Operation
as defined in the
Pretreat
Maintenance Card
Section, this indicates how many
cycles the system will spend filling with water.
• Mix Ratio Alarm
: Determines how far off the Mix
Ratio has to be before it will alert the operator.
• Load Orientation
: Determines where “Top” is
displayed on the
Load Zone
and how sprays are to be
oriented.
▪
Collar Right
: Top is displayed to the Right of the
operator, and garments are meant to be loaded
with the collar towards the right. This gives a Max
Spray Area of 24” Tall and 18” Wide.
▪
Collar Up
: Top is displayed nearest the Spray
Chamber, and garments are meant to be loaded
with the collar towards the Spray Chamber. This
gives a Max Spray Area of 18” Tall and 24” Wide.
• Collar Width
: Defines how far apart the collar
alignment bars next to the Top of the Load Zone are.
For further customizations to the Synergy Pretreater
behavior, contact Brown Manufacturing.