![Brocade Communications Systems ICX 7250 Stacking Deployment Manual Download Page 73](http://html1.mh-extra.com/html/brocade-communications-systems/icx-7250-stacking/icx-7250-stacking_deployment-manual_2817204073.webp)
There is no startup config file, unable to save legacy config
Automatic copy to member units: 2 3 4 5 6 7 8 9 10 11 12
ICX7250-24P Switch#Flash Memory Write (1048576 bytes per dot) .
Write startup-config done.
Copy Done.
ICX7250-24P Switch#show stack
T=20m51.2: alone: standalone, D: dynamic cfg, S: static, A=10, B=11, C=12
ID Type Role Mac Address Pri State Comment
1 S ICX7250-24P active cc4e.24b4.7c50 128 local Ready
2 S ICX7250-48P standby cc4e.24b4.2eb0 0 remote Ready
3 S ICX7250-48P member cc4e.24b4.2f28 0 remote Ready
4 S ICX7250-24 member cc4e.24b4.8988 0 remote Ready
5 S ICX7250-48 member cc4e.24b4.2820 0 remote Ready
6 S ICX7250-48 member cc4e.24b4.2514 0 remote Ready
7 S ICX7250-24 member cc4e.24b4.83a0 0 remote Ready
8 S ICX7250-24 member cc4e.24b4.8064 0 remote Ready
9 S ICX7250-24 member cc4e.24b4.84c0 0 remote Ready
10 S ICX7250-24 member cc4e.24b4.8670 0 remote Ready
11 S ICX7250-24P member cc4e.24b4.7efc 0 remote Ready
12 S ICX7250-24P member cc4e.24b4.7bc0 0 remote Ready
active
+---+ +---+ +---+ +---+ +---+ +---+
-2/5| 1 |2/7==2/7| C |2/5==2/1| B |2/3==2/3| A |2/1==2/1| 9 |2/3==2/3| 8 |2/1=
| +---+ +---+ +---+ +---+ +---+ +---+ |
| |
| standby |
| +---+ +---+ +---+ +---+ +---+ +---+ |
-2/3| 2 |2/1==2/1| 3 |2/3==2/1| 4 |2/3==2/1| 5 |2/3==2/3| 6 |2/1==2/1| 7 |2/3=
+---+ +---+ +---+ +---+ +---+ +---+
Standby u2 - protocols ready, can failover
Current stack management MAC is cc4e.24b4.7c50
ICX7250-24P Switch#
Stack construction method 2: Manual configuration
Description
With this method, user should configure every unit individually and enable stacking on each unit. Once
the units are connected together, they automatically form a stack. With this method, the unit with the
highest priority becomes the active controller, and ID assignment is determined by the sequence in
which user physically connects the units. The example used below is 12 units to form a ring stack.
Steps
Summarized steps:
• Configure highest priority on an intended active controller.
• Configure second highest priority on an intended standby controller.
• Configure 'stack suggest-id' on the units you chose to have a desired ID.
• Configure 'stack enable' on all the units and connect the units using stack ports.
Detailed steps
1. Units should boot up using same software image.
2. On a unit is intended to be the active controller, configure priority 255. If a unit is intended to be on
standby, configure a priority less than the active unit; for example, 240.
3. To configure a stack trunk manually on a stack unit, use the stack-trunk command on every single
unit. In a live production environment, use the multi-stack-trunk command and use multi stack port
command to remove change a stack trunk to stack.
UNIT 1:
ICX7250-24P Switch(config)#stack unit 1
ICX7250-24P Switch(config-unit-1)#priority 255
Stack construction method 2: Manual configuration
Brocade ICX 7450, Brocade ICX 7750, and Brocade ICX 7250 Stacking Deployment Guide
73
53-1003581-03