![Brocade Communications Systems ICX 7250 Stacking Deployment Manual Download Page 49](http://html1.mh-extra.com/html/brocade-communications-systems/icx-7250-stacking/icx-7250-stacking_deployment-manual_2817204049.webp)
T:3m9.2: Done hot swap: active controller u1 sets u9 to Ready.
T:3m9.5: Done hot swap: active controller u1 sets u6 to Ready.
T:3m9.5: Done hot swap: active controller u1 sets u7 to Ready.
Stack unit 5 Power supply 1 is up
Stack unit 5 Power supply 2 is down
Config changed due to add/del units. Do write mem if you want to keep it
T=3m13.6: Election, was active, no change, ID=1, pri=128, 12U(1-12), A=u1, nbr#=11
11, reason: u1: stk-po-chg, ,
Config changed due to add/del units. Do write mem if you want to keep it
T=4m14.5: Assigned unit 2 to be standby
T=4m16.5: start running config sync to standby u2
T=4m16.6: Running config sync to standby u2 is complete
9. After the stack units have booted up, the stack formation is complete. Stack status can be verified
using 'show stack' command. In this output, D indicates a dynamic configuration. After you perform a
write memory, this display will change to S, for static configuration.
ICX7750-48F Switch# show stack
T=9m57.1: alone: standalone, D: dynamic cfg, S: static, A=10, B=11, C=12
ID Type Role Mac Address Pri State Comment
1 S ICX7750-48XGF active cc4e.246d.9e00 128 local Ready
2 D ICX7750-48XGF standby cc4e.246d.8d80 0 remote Ready
3 D ICX7750-48XGF member cc4e.246d.9b00 0 remote Ready
4 D ICX7750-48XGF member cc4e.246d.9c80 0 remote Ready
5 D ICX7750-20QXG member cc4e.2439.2a80 0 remote Ready
6 D ICX7750-20QXG member cc4e.2439.3700 0 remote Ready
7 D ICX7750-20QXG member cc4e.2439.3880 0 remote Ready
8 D ICX7750-20QXG member cc4e.2439.2d00 0 remote Ready
9 D ICX7750-48XGC member cc4e.2439.1a00 0 remote Ready
10 D ICX7750-48XGC member cc4e.2439.1680 0 remote Ready
11 D ICX7750-48XGC member cc4e.2439.1d80 0 remote Ready
12 D ICX7750-48XGC member cc4e.2439.1280 0 remote Ready
active
+---+ +---+ +---+ +---+ +---+ +---+
-2/1| 1 |2/4--2/1| C |2/4==2/1| B |2/4==2/1| A |2/4--2/1| 9 |2/4--2/1| 8 |2/4-
| +---+ +---+ +---+ +---+ +---+ +---+ |
| |
| standby |
| +---+ +---+ +---+ +---+ +---+ +---+ |
-2/4| 2 |2/1--2/4| 3 |2/1--2/4| 4 |2/1==2/4| 5 |2/1--2/4| 6 |2/1==2/4| 7 |2/1-
+---+ +---+ +---+ +---+ +---+ +---+
Standby u2 - protocols ready, can failover
Current stack management MAC is cc4e.246d.9e0
Stack construction method 2: Manual configuration
Description
With this method, user should configure every unit individually and enable stacking on each unit. Once
the units are connected together, they automatically form a stack. With this method, the unit with the
highest priority becomes the active controller, and ID assignment is determined by the sequence in
which user physically connects the units. The example used below is 12 units to form a linear stack.
Steps
Summarized steps:
• Configure highest priority on an intended active controller.
• Configure second highest priority on an intended standby controller.
• Configure 'stack suggest-id' on the units you chose to have a desired ID.
• Configure 'stack enable' on all the units and connect the units using stack ports.
Detailed steps:
1. Units should boot up using same software image.
2. On a unit intended to be the active controller, configure the priority unit at 255. Configure the standby
unit to be less than the priority (active) unit, for example, 240.
Stack construction method 2: Manual configuration
Brocade ICX 7450, Brocade ICX 7750, and Brocade ICX 7250 Stacking Deployment Guide
49
53-1003581-03