Repairs
2016-03-02 / DIS 840_58300000176874_ara_en_c
Copyright by BSH Hausgeräte GmbH
Page 150 of 157
2. Position the Z-shaped projection of the water switch between the two
projections of the sump (1).
3. Position the water switch on the sump (2) turn it anticlockwise (3) and engage.
4. Secure the hose to the fleet reservoir (optional) (4).