2
Installation
10
Blue Seal Evolution Series Gas Convection Ranges
© Copyright Moffat Ltd. 21 June 2016
Amendment 13
6.
Check that the gas operating pressure is as shown in the ‘Specifications’ section.
NOTE: Measure Burner Operating Pressure at manifold test point with 2 burners
operating at ‘Full’ setting.
7.
Verify the operating pressure remains correct.
Electrical Connection
NOTE:
ALL ELECTRICAL CONNECTIONS MUST ONLY BE CARRIED OUT BY AN AUTHORISED PERSON.
Each appliance should be connected to an adequately protected power supply and isolation switch mounted adjacent to, but not
behind the appliance. This switch must be clearly marked and readily accessible in case of fire.
1.
Check that the electricity supply is correct as shown on the Rating Plate attached to the front right hand corner of the bottom
sill.
2.
The appliance is fitted with a 10 Amp, 3 pin plug cordset for connection to a properly earthed, 3 pin switched electrical socket.
Commissioning
1.
Before leaving the new installation;
a.
Check the following functions in accordance with the operating instructions.
Lighting the Griddle.
Light the Open Burners. (F - Flame Failure Option).
Light the Open Burners. (PF - Pilot and Flame Failure Option).
Check the Low Fire Burner operation.
Check the High Fire Burner operation.
Light the Oven Pilot and Main Burners.
Check the Oven Main Burner Thermostat operation.
Check the Oven Fan operation.
b.
Ensure that the operator has been instructed in the areas of correct lighting, operation, and shutdown procedure for the
appliance.
Fig 2
Manifold
Test Point
Summary of Contents for Evolution Series