20
Electrical connections must comply with wiring diagram supplied with the unit and conform to established
regulations.
Earth connection is compulsory by law. When installing the unit make sure that the earth cable is connected via
the terminal on the earth bar of the electrical panel.
Ensure that power supply voltage corresponds to unit ratings (voltage, number of phases, frequency) as specified
on the unit dataplate.
The power supply voltage must not be subject to fluctuations in excess of ±5% and the difference between
phases must remain below 2%.
If this is not the case, contact our technical department for the recommended protection devices.
Check power connection for correct phase sequence.
For cable connection drill the metallic cover on the side or on the bottom of electric control box, according to the
model..
The control circuit power supply is taken from the power line by means of a transformer installed in the electrical
panel
The control circuit is protected by fuses.
4.8 ELECTRICAL CONNECTIONS
4.8 ELECTRICAL CONNECTIONS
4.8 ELECTRICAL CONNECTIONS
4.8 ELECTRICAL CONNECTIONS
4.8 ELECTRICAL CONNECTIONS
4.8.1 GENERAL NOTES
4.8.1 GENERAL NOTES
4.8.1 GENERAL NOTES
4.8.1 GENERAL NOTES
4.8.1 GENERAL NOTES
Ensure that the unit is disconnected from the power supply before carrying
Ensure that the unit is disconnected from the power supply before carrying
Ensure that the unit is disconnected from the power supply before carrying
Ensure that the unit is disconnected from the power supply before carrying
Ensure that the unit is disconnected from the power supply before carrying
out any operations on the electrical parts.
out any operations on the electrical parts.
out any operations on the electrical parts.
out any operations on the electrical parts.
out any operations on the electrical parts.
The section of the cable and the line protections must comply with
The section of the cable and the line protections must comply with
The section of the cable and the line protections must comply with
The section of the cable and the line protections must comply with
The section of the cable and the line protections must comply with
indications in the wiring diagram.
indications in the wiring diagram.
indications in the wiring diagram.
indications in the wiring diagram.
indications in the wiring diagram.
Operation must remain within the above limits: otherwise the guarantee
Operation must remain within the above limits: otherwise the guarantee
Operation must remain within the above limits: otherwise the guarantee
Operation must remain within the above limits: otherwise the guarantee
Operation must remain within the above limits: otherwise the guarantee
will no longer be considered valid.
will no longer be considered valid.
will no longer be considered valid.
will no longer be considered valid.
will no longer be considered valid.
Supply cable fixing: supply cable must be fixed so as to withstand any
Supply cable fixing: supply cable must be fixed so as to withstand any
Supply cable fixing: supply cable must be fixed so as to withstand any
Supply cable fixing: supply cable must be fixed so as to withstand any
Supply cable fixing: supply cable must be fixed so as to withstand any
tensile and torsional stress.
tensile and torsional stress.
tensile and torsional stress.
tensile and torsional stress.
tensile and torsional stress.
Check that the crankcase heaters are correctly supplied.
1) Close the main switch turning it from position “0” to position “1”
2) Check that the display shows “OFF”
3) Check that unit is in “OFF” position and external interlock is open
4) If the display shows the alarm “WRONG PHASE SEQUENCE”, invert 2 phases
of the power supply.
5) The unit must remain for a minimum of 12 hours in this situation to supply
the crankcase heaters
Crankcase heaters must be supplied at least 12 hours before start up by
Crankcase heaters must be supplied at least 12 hours before start up by
Crankcase heaters must be supplied at least 12 hours before start up by
Crankcase heaters must be supplied at least 12 hours before start up by
Crankcase heaters must be supplied at least 12 hours before start up by
simply closing the main switch (heaters are automatically supplied when
simply closing the main switch (heaters are automatically supplied when
simply closing the main switch (heaters are automatically supplied when
simply closing the main switch (heaters are automatically supplied when
simply closing the main switch (heaters are automatically supplied when
main switch is closed).
main switch is closed).
main switch is closed).
main switch is closed).
main switch is closed).