4
Attention: Before carrying out service interventions on the unit make
Attention: Before carrying out service interventions on the unit make
Attention: Before carrying out service interventions on the unit make
Attention: Before carrying out service interventions on the unit make
Attention: Before carrying out service interventions on the unit make
sure that the power supply is disconnected.
sure that the power supply is disconnected.
sure that the power supply is disconnected.
sure that the power supply is disconnected.
sure that the power supply is disconnected.
All work on the unit must be carried out by qualified persons only
All work on the unit must be carried out by qualified persons only
All work on the unit must be carried out by qualified persons only
All work on the unit must be carried out by qualified persons only
All work on the unit must be carried out by qualified persons only
FIELD OF APPLICATION
FIELD OF APPLICATION
FIELD OF APPLICATION
FIELD OF APPLICATION
FIELD OF APPLICATION
These units have been designed for cooling (chiller version) or cooling/heating (heat pump version) water, generally
used in air conditioning or refrigeration applications.
Their recommended operation range is reported in paragraph 6 of this manual.
1. GENERAL
1. GENERAL
1. GENERAL
1. GENERAL
1. GENERAL
- When installing or servicing the unit adhere strictly to the prescriptions in this manual, conform to all specifications
and take all necessary precautions where required.
- Pressure in the refrigerant circuit and the electrical equipment present in the unit may be hazardous during
installation or servicing.
- Failure to observe the prescriptions in this manual or modification to the unit without prior and specific authorisation
will result in the immediate termination of the warranty.
2 .
2 .
2 .
2 .
2 . INSPECTION, TRANSPORTATION AND POSITIONING
INSPECTION, TRANSPORTATION AND POSITIONING
INSPECTION, TRANSPORTATION AND POSITIONING
INSPECTION, TRANSPORTATION AND POSITIONING
INSPECTION, TRANSPORTATION AND POSITIONING
2.1 INSPECTION
2.1 INSPECTION
2.1 INSPECTION
2.1 INSPECTION
2.1 INSPECTION
Upon receipt of the unit, make sure that it is intact. The unit was shipped from the factory in perfect working
order and any damage must be reported to the carrier and recorded on the Delivery Note.
Blue Box or its Agent must be informed as soon as possible of the extent of any damage.
The customer should prepare a written statement and photographic evidence of any significant damage.
2.2 LIFTING AND TRANSPORTATION
2.2 LIFTING AND TRANSPORTATION
2.2 LIFTING AND TRANSPORTATION
2.2 LIFTING AND TRANSPORTATION
2.2 LIFTING AND TRANSPORTATION
When unloading the unit avoid any sudden movements. When moving the unit within the premises, do not apply
leverage or force to any of the appliance’s components.
The unit must be lifted using steel tubes inserted through the lifting holes marked by yellow arrows. Models 16.1
and 18.1 should be lifted using the eye-bolts located along the sides of the unit.
The unit should be lifted as per the figure below: using chords and suitably long cables and spacing bars so as not
to damage the sides and cover. If lifting platforms are used, then make sure that the width of the device is not
inferior to the width of the unit (see figure).
Summary of Contents for KAPPA V 2001
Page 69: ......