Chapter 2 Installation and Setup
MT1000A
Installation and Operation Manual
2-2 Package
Contents
Fiber Optic Link Connections
Each fiber optic link interface is terminated in two ST, SC, or FC-PC connectors, in
accordance with order. The maximum allowable attenuation depends on the
interface option ordered (refer to
Table 1-1
).
When working with the WDM option, only one fiber optic cable per link should
be connected. The two types – SF1 and SF2 – must work opposite each other; SF1
cannot work opposite SF1, and SF2 cannot work opposite SF2.
Front and Rear Panel Clearance
Allow at least 90 cm (36 inches) of frontal clearance for operator access. Allow at
least 10 cm (4 inches) clearance at the rear of the unit for interface cable
connections.
When planning the routing of fiber optic cables, avoid sharp bends.
Unit Clearance
Allow 1U clearance above MT1000A-E1 for proper ventilation.
Ambient Requirements
The ambient operating temperature of the MT1000A is 0
°
to 50
°
C (32
°
to 122
°
F),
at a relative humidity of up to 90%, non-condensing.
2.3 Equipment
Needed
The equipment needed to install the MT1000A is:
•
ST, SC or FC/PC fiber optic interface link connector cables
•
RJ-45 T1 connector cables (for tributary interface)
•
Phillips screwdriver (for installation in 19 inch rack).
2.4 Package
Contents
The MT1000A package contains the following:
•
MT1000A multiplexer
•
CBL-DB9M/DB9F cable
•
Two power supply cables
•
AC/DC Adaptor (AD) plug
•
MT1000A Installation and Operation
manual
Summary of Contents for MT1000A-13-R3
Page 2: ......
Page 16: ...Chapter 1 Introduction MT1000A Installation and Operation Manual 1 10 Technical Specifications...
Page 28: ...Chapter 3 Operation MT1000A Installation and Operation Manual 3 4 Turning MT1000A Off...
Page 72: ...Appendix B MT1000A MIBs MT1000A Installation and Operation Manual B 2...