USER MANUAL 1.10 | DC1000 DIALOG-CONTROLLER
Berghof Automation GmbH | Harretstrasse 1 | 72800 Eningen | www.berghof.com
DC1000_HB_en_2D0982010ZD00.docx | 2VF100124FE08.docx
80
SC test - X8 pin assignment
Pin
Signal
Description
1
CAN
CAN signal
2
GND
Signal ground
A test or so-called “monitoring interface” for the SC_CAN is located on this connector. This “monitoring in-
terface” serves to analyze the SC_CAN telegrams and possess the following characteristics:
It is a point-to-point interface;
It is only for devices with an ISO11898 CAN interface;
CAN telegrams cannot be sent;
No terminating resistors may be employed.
Pin assignment for an adapter cable
2-pin post (2.54)
9-pin Sub D
Pin
Signal
Signal
Pin
1
CAN
CAN HIGH
2
2
GND
CAN LOW
7
For special applications an external 7-segment display (with integrated infrared receiver) can be connected to
the I/O subassembly. Connection is to connector X11 by means of a cable available from Berghof. The exter-
nal display can be addressed from the software in the same way as the digital I/Os.
2-pin post connector
External 7-segment
display