¡
The indicator light (charge display) is lit, the batteries are charging.
1. Table power switch
2. Fuses
3. Socket for the AC power cord
4. Ground/potential equalization
5. Indicator light (AC present)
NOTICE
Make sure to ground (4) any additional components used.
3.6.1 Connecting the potential equalization
If required by local codes, procedures, or when using other devices with
requirements to do so, connect the potential equalization cable to the
potential equalization pin of the mobile OR table. Connect the other
end of the potential equalization cable to the potential equalization pin
of the operating room.
NOTICE
An authorized service technician must check the electrical con‐
ductivity of the product annually.
Overview of IEC
connectors
Establish potential
equalization
Operator Manual Surgical Mobile Operating Table Models D860, D850, D 830, D820, D770, D760
Installation and initial start-up
23