33
Bend-Tech Dragon A250
Assembly Manual
Cables and Control Box
06
06
Cables and Control Box
6.1 Cable Pre-Installation
The Dragon A250 is delivered with the Cable Track rolled up and shrink wrapped at the front of
the machine, just behind the Trolley. The cables are pre-connected to the various components
on the Head of the Dragon A250.
The Installer will be required to unroll the Cable Track on the Cable Track Tray and route the
ends of the cables to the Control Box.
6.2 Installing the Cable Track
Remove the shrink wrap and unroll the Cable Track into the Cable Track Tray.
Route the cable ends through the large grommet in the Cable Track Tray.
Once the cables are routed through the hole in the cable track tray, click the end of the Cable
Track into the Cable Track Guide mounted on the Cable Track Tray.
Tools Needed
• Utility Knife
•
3/16 in. Allen Wrench
Hardware Needed
• Hardware Bag No. 4
Summary of Contents for Dragon A250 Series
Page 1: ...A250 Part 1 of 1 Assembly Manual Revision 1 English 2020 Bend Tech LLC ...
Page 30: ...30 Bend Tech Dragon A250 Assembly Manual Leveling and Alignment 04 ...
Page 36: ...36 Bend Tech Dragon A250 Assembly Manual Cables and Control Box 06 ...
Page 38: ...38 Bend Tech Dragon A250 Assembly Manual Air Line 07 ...
Page 42: ...42 Bend Tech Dragon A250 Assembly Manual Torch 08 ...