25
Bend-Tech Dragon A250
Assembly Manual
Assembling the Dragon
03
3.9 Installing the Racks
Use the bridge rack, which is
located in the miscellaneous
box, to set the spacing
between the racks. Hold the
bridge rack with a clamp
to ensure proper spacing
between racks while tightening
the 3/16 in. Allen bolts.
3.10 Installing the Cable Track Tray
The cable track trays are numbered to coincide with the beam sections. Align the cable track
trays so that the numbers line up with the coinciding numbers on the beam.
One cable track tray has a hole for the wires to feed though, this tray should be positioned so
the hole is towards the tail of the machine.
Bridge Rack
Clamp
The tail of the machine and head of the machine are pre-assembled at the Bend-Tech
manufacturing facility and will arrive with the cable track tray pre-installed.
Tools Needed
•
7/32 in. Allen wrench
Hardware Needed
• Hardware Bag No. 3
Summary of Contents for Dragon A250 Series
Page 1: ...A250 Part 1 of 1 Assembly Manual Revision 1 English 2020 Bend Tech LLC ...
Page 30: ...30 Bend Tech Dragon A250 Assembly Manual Leveling and Alignment 04 ...
Page 36: ...36 Bend Tech Dragon A250 Assembly Manual Cables and Control Box 06 ...
Page 38: ...38 Bend Tech Dragon A250 Assembly Manual Air Line 07 ...
Page 42: ...42 Bend Tech Dragon A250 Assembly Manual Torch 08 ...