34
Bend-Tech Dragon A250
Assembly Manual
Cables and Control Box
06
6.3 Routing Cables
With the cables fed through the
hole in the cable track tray, place
the three 1 ½ in. cable loops from
Fastener Bag No. 4 around the
cables at even intervals between
the hole and the area just above the
control box.
Secure the cable loops along the
center of the Rail Beam using the
T-Nuts and screws in Fastener Bag
No. 4. Tighten securely to the side
of the Rail Beam.
6.4 Connect to Control Box
With the cables routed along the Rail Beam, insert the cables in their appropriate connections
at the Control Box. Both the cables and the Control Box will be clearly labeled. Tighten
securely by hand.
Cable Track Tray
Hole for Cables
Cable Track
Summary of Contents for Dragon A250 Series
Page 1: ...A250 Part 1 of 1 Assembly Manual Revision 1 English 2020 Bend Tech LLC ...
Page 30: ...30 Bend Tech Dragon A250 Assembly Manual Leveling and Alignment 04 ...
Page 36: ...36 Bend Tech Dragon A250 Assembly Manual Cables and Control Box 06 ...
Page 38: ...38 Bend Tech Dragon A250 Assembly Manual Air Line 07 ...
Page 42: ...42 Bend Tech Dragon A250 Assembly Manual Torch 08 ...