15
Bend-Tech Dragon A250
Assembly Manual
Assembling the Dragon
03
3.1 Shipping Crate
The Dragon A250 is shipped from the Bend-Tech manufacturing facility in a custom-fabricated
shipping crate. This crate features a steel reinforced floor and is fully-enclosed to ensure
the protection of the Dragon A250 during shipping. The Dragon A250 machine is completely
secured within the crate for shipping purposes. Components may be bolted to the crate,
shrink wrapped, or secured with plastic or metal banding. The order in which components
are uncrated is important in executing proper assembly of the machine. For best results in
assembling the Dragon A250, carefully follow the steps outlined in this Assembly Manual.
3.1.1 Dragon A250 Shop Position
Before beginning assembly, ensure there is adequate space to accommodate the machine
on the shop floor. Plan on reserving a minimum of 28-feet for the full length machine, if the
material cooling system is installed more room will be needed.
3.2 Crate Disassembly
03
Assembling the Dragon
Tools Needed
• Cordless Driver
• T25 Bit
Summary of Contents for Dragon A250 Series
Page 1: ...A250 Part 1 of 1 Assembly Manual Revision 1 English 2020 Bend Tech LLC ...
Page 30: ...30 Bend Tech Dragon A250 Assembly Manual Leveling and Alignment 04 ...
Page 36: ...36 Bend Tech Dragon A250 Assembly Manual Cables and Control Box 06 ...
Page 38: ...38 Bend Tech Dragon A250 Assembly Manual Air Line 07 ...
Page 42: ...42 Bend Tech Dragon A250 Assembly Manual Torch 08 ...