29
Bend-Tech Dragon A250
Assembly Manual
Leveling and Alignment
04
4.2.1 Checking the Straightness
Once the machine is assembled, hook the loops of the string around the ¼ -20 ⅝ in. Allen
head cap screws at the front and rear of the machine. Ensure the string is positioned just under
the head of the Allen head cap screw.
With the string installed, ensure it is even with the tops of the Allen head cap screws installed
in each of the Support Legs. The string should be flush with the top of each fastener along the
length of the machine, as pictured.
4.2.2 Rail Splices
Ensure that each Rail splice intersects with the next as seamlessly as possible. Ensure that all
of the Rail splices are fastened properly to the Rail.
Aligning the Rail Splices is one of the most difficult and time-consuming parts of the
assembly process. Ensuring Rail Splices are straight and even is critical to the setup
of the Dragon A250. Bend-Tech recommends experienced personnel perform the Rail
Splice installation.
String
Allen head screws
attaching the Support
Legs to the Rails.
Summary of Contents for Dragon A250 Series
Page 1: ...A250 Part 1 of 1 Assembly Manual Revision 1 English 2020 Bend Tech LLC ...
Page 30: ...30 Bend Tech Dragon A250 Assembly Manual Leveling and Alignment 04 ...
Page 36: ...36 Bend Tech Dragon A250 Assembly Manual Cables and Control Box 06 ...
Page 38: ...38 Bend Tech Dragon A250 Assembly Manual Air Line 07 ...
Page 42: ...42 Bend Tech Dragon A250 Assembly Manual Torch 08 ...