BELARUS-
1523/1523В
/1523.3
/1523В.3
Scheduled Maintenance
274
AFTER EVERY 2000 HOURS OF OP-
ERATION
perform the previous main-
tenance procedures plus the followings:
Procedure 56. Checking the Fuel In-
jection Equipment
To check the injectors for injection pres-
sure, dismantle them from the engine by
carrying out the following operations:
•
screw out the coupling nuts (6) of the
unions of the fuel pump and the injec-
tors;
•
remove the high-pressure pipes (4);
•
remove the bolts (1) of the unions
from each injector together with their
sealing washers and remove the
draining pipeline (3);
•
screw out bolts (2) which fix the injec-
tors and remove the injectors (5);
•
send the injectors to a specialized
workshop or your dealer for checking.
NOTE:
The injection pressure should
be within 22...23 MPa.* The atomiza-
tion should be in the form of a mist,
without continuous jets and/or drips.
Timing angles for engines Д
-260.1 and
Д
-
260.1S fitted with fuel pumps “YAZDA”
or “Motorpal”, should correspond to
those given in Table on the right:
To check and adjust the injectors, dis-
mantle them from the engine and send
them to a specialized workshop.
Timing angles for fuel injection
(degrees to TDC)
Engine
Д
-260.1
260.1S2
Fuel pump
363-40.01 Motorpal 363-40.01 Motorpal
19...21 21...23 14...16** 15...17
Summary of Contents for 1523
Page 1: ...BELARUS 1523 1523В 1523 3 1523В 3 1523 0000010 РЭ OPERATING MANUAL 2009 ...
Page 70: ......
Page 72: ......
Page 76: ......
Page 77: ...BELARUS 1523 1523В 1523 3 1523В 3 Construction and Operation 73 ...
Page 78: ......
Page 124: ......
Page 131: ......
Page 137: ......
Page 151: ......
Page 160: ......
Page 162: ...BELARUS 1523 1523В 1523 3 1523В 3 Construction and Operation 152 ...
Page 163: ......