BELARUS-
1523/1523В
/1523.3
/1523В.3
Drive Controls and Instrumentation
39
List of programmable coefficients (graphical examples of displaying the parameters
and their values in the programming mode):
Parameter “Z”
Z is the number of teeth of the pinions of the final shafts of the driving
wheels (right and left), over which the (rotational) speed sensors are
installed.
Parameter “I”
I is the multiplying factor of the gear rate of the wheel reduction gear.
Parameter “R”
R
is the rear wheel rolling radius, mm
. When reprogramming, this
parameter can be varied with the step of 5 mm.
Note:
830 is the value for the tyres 520/70R38. In case of fitting other
types of tyres, it is necessary to set the value of the parameter “R” cor-
responding to the rolling radius of the tyres fitted.
Tyre
520/70R38
18.4R38
11.2R42
R
к
, m
0.828
0.829
0.750
Number to
be coded
830
830
750
Parameter KV2
KV2 is the reduction ratio of the PTO shaft.
Note:
The coefficient KV2 can have an arbitrary value for tractors be-
cause it is not used in the calculation of the PTO rotational speed
Parameter ZV
ZV is the number of teeth of the washer of the PTO rotational speed
sensor
Parameter «V»
V is the fuel tank volume, l.
Note:
Only the volume of the side fuel tank shall be entered (250 litres),
respectively, the information on the time of work with the remaining fuel
is formed without taking into account the volume of the fuel in the tank
located under the cab (the volume of which is 120 litres)
Also, when pressing the
“Parameter” (Параметр) button in the pr
o-
gramming mode, the list of programmable parameters shows the inde-
pendent parameter “
Т
” of the accurate content of the counter of the
total astronomical time of running of the engine in hours. This parame-
ter is unavailable for measuring; it is an accurate value (to 1/10 hours)
of the time of running of the engine.
Summary of Contents for 1523
Page 1: ...BELARUS 1523 1523В 1523 3 1523В 3 1523 0000010 РЭ OPERATING MANUAL 2009 ...
Page 70: ......
Page 72: ......
Page 76: ......
Page 77: ...BELARUS 1523 1523В 1523 3 1523В 3 Construction and Operation 73 ...
Page 78: ......
Page 124: ......
Page 131: ......
Page 137: ......
Page 151: ......
Page 160: ......
Page 162: ...BELARUS 1523 1523В 1523 3 1523В 3 Construction and Operation 152 ...
Page 163: ......