BELARUS-
1523/1523В
/1523.3
/1523В.3
Scheduled Maintenance
246
Sequence of the Maintenance Operations
The operator shall perform the daily in-
spection of the tractor for preventing the
loosening of the joints, holders and fas-
teners, leaks of the coolant and oil, for
removing the dirtying of the tractor’s
mechanisms as well as other preventive
works for ensuring the tractor operability,
fire safety and safety in fulfilling various
missions as a part of the machine-tractor
aggregate.
ATTENTION!
Prior to performing the
works for repairing or servicing the
tractor, stop the engine and apply the
parking-reserve brake.
If the protective shields were removed
for performing the works, make sure
that they are refitted in place on finish-
ing the works.
NEVER
discharge used oils onto the
ground. Use special vessels for collect-
ing and storing them. When changing
oil, drain it immediately after running
the tractor, while the oil is warm.
For checking oil level, place the tractor
on a flat level ground.
Prior to performing the maintenance
works, remove the engine side panels
and raise the bonnet. To do this:
•
remove the monocyclon (1) of the air
cleaner;
•
push down the catch handle (3) and
remove the right- and left-hand side
panels of the liner;
•
pull the bonnet latch handle (2) (found
on the left-hand side of the tractor),
raise the bonnet (5) and lock it in this
position by inserting the supporting
stay (4) into the opening of the bracket
(6).
ATTENTION!
Make sure that the stay
(4) is locked securely in the opening of
the bracket (6).
1 – monocyclon of the air-cleaner; 2 – lock han-
dle; 3 – latch handle; 4 – supporting stay; 5 –
bonnet; 6 – bracket.
Summary of Contents for 1523
Page 1: ...BELARUS 1523 1523В 1523 3 1523В 3 1523 0000010 РЭ OPERATING MANUAL 2009 ...
Page 70: ......
Page 72: ......
Page 76: ......
Page 77: ...BELARUS 1523 1523В 1523 3 1523В 3 Construction and Operation 73 ...
Page 78: ......
Page 124: ......
Page 131: ......
Page 137: ......
Page 151: ......
Page 160: ......
Page 162: ...BELARUS 1523 1523В 1523 3 1523В 3 Construction and Operation 152 ...
Page 163: ......